McFetridge Earthworks

Scope of Works

101 Establishment and disestablishment

101 Establishment and disestablishment
103 Health and Safety Plan and implementation.
104 QA Plan and all testing and inspections.
105 Traffic Management Plan  preparation and implementation
106 Survey work required for the setout and control of construction works
107 Asbuilts

200 SITE PREPARATION  

CONTAMINATED SOIL: EROSION AND SEDIMENT CONTROL:  
Environmental controls, as follows:
a Establish all environmental controls, including maintenance to existing structures and facilities.
b Maintenance of all silt control measures throughout the contract and defects liability period and disestablishment of controls when approved by the Engineer.
c Maintenance of all dust control measures throughout the contract and defects liability period.

SITE CLEARANCE:
210 Demolition  and removal of existing dwelling and accessory buildings
211 Full site clearance from area of earthworks to waste off site of all other unwanted items, including fences, concrete, asphalt, rubbish, trees and tree stumps

220 EARTHWORKS  

221 Strip topsoil and stockpile on site
222 Supply all materials, excavate for, lay,and backfill subsoil drainage
223 Cut to compacted fill
224 Cut to stockpile
225 Cut unsuitables and cart to waste offsite
226 Respread topsoil from stockpile to all filling areas, a b
227 Grassing – sow grass seed to all respread topsoil areas
227 b Maintenance of grassed area

800 RETAINING WALLS

804 Supply, prepare and construct timber post retaining walls

Quick Facts

  • 184 Section Subdivision
  • Location: Ohauiti Taruanga
  • Duration: Jan 2016 – present